A device isn’t ready just because it’s been unpacked

There’s a moment every reseller knows, but nobody puts in their quote: the box is open, the device is sitting on the table, the end customer is delighted – and that’s when the work begins. Charge the battery, update the operating system, configure the Wi-Fi, install the app, lock down kiosk mode, apply the label, record the serial number. For one device, that’s a coffee break. For two hundred, it’s a weeks worth of work that nobody pays you for.

Let’s do the math without sugar-coating it. Two hundred mobile computers, fifteen minutes of setup per device – realistic, if anything, that’s on the conservative side. That’s fifty hours. Do it on-site at the end customer’s premises and you also have travel time, waiting for the IT manager who can’t find the Wi-Fi password, and that one room without any power sockets. At an hourly rate of €80, you’re quickly looking at €4,000 in costs – for a project where the gross profit on the hardware might barely be any higher. At that point, you haven’t sold anything. You’ve made a donation.

The usual response is: »I’ll just factor that into the price.« In theory, correct. In practice, your competitor’s quote lists the bare hardware, and your end customer compares numbers, not individual work steps. So you don’t factor it in after all, hope for a quick rollout and discover on day three that half the devices are running a different firmware version from the other half.

That’s exactly what staging is for – pre-configuration before the goods leave our warehouse. The devices arrive at your customer’s premises exactly as they need them: updated, configured and labelled, with a serial number list included with the delivery. Unpack, switch on, get to work. When I wrote about proprietary software, I said that pre-configuration, bundles and rollout plans aren’t standard processes you simply buy off the shelf. Here’s why: If you want to configure two hundred devices identically, you need more than just pairs of hands. You need repeatability.

Now for the uncomfortable part: Staging costs money. We don’t do it for free, and I’m not going to tell you that it always pays off. If you have three scanners that simply need to be unpacked and plugged in, you don’t need us. The equation changes when quantities, configuration complexity and multiple locations come together – and that point arrives sooner than most people think. Our effort per device is lower because we do it every day. Yours is higher because you do it every three months and each time you first have to work out where you saved the configuration file from the last rollout.

And there’s another benefit that doesn’t show up in any calculation of working hours: Suddenly, you’re selling a service rather than a box. Staging appears as a separate line item in your quote, with your margin on top, and your end customer gets a rollout they don’t have to think about. A device that works from day one is the best argument for why the cheaper supplier wasn’t actually cheaper after all.

So my advice is this: For every project involving twenty devices or more, don’t start by asking about the price per unit. Start by asking what needs to happen after the box is opened. The answer determines whether you make money on the project – or simply deliver it.

So remember: »The most expensive working hour is the one spent on-site at the customer’s premises – and that doesn’t appear in any quote.«
 